Airblend

Contract Manufacturing

Airblend coordinates production projects with specialist manufacturing partners, from component processing through assembly, verification and release.

Medical-device production lines and organized warehouse storage

Project Scope

Own-brand, customer-brand and customer-designed medical devices and single-use products.

Production Capabilities

Component & material processing

  • Cleanroom PVC tubing extrusion
  • Cleanroom injection molding
  • Cleanroom LSR injection moldingLiquid silicone rubber components

Precision machining & tooling

  • High-precision machining · 0.1–26 mmSwiss-type sliding-head machining, CNC turning and precision grinding
  • Wire EDM cutting
  • Tooling & mold manufacturingPlastic-injection, aluminum die-casting and composite molds
  • Stainless-steel electropolishing
  • Medical & dental components

Electronics, assembly & verification

  • Printed circuit board assembly (PCBA)
  • Cleanroom assembly & automation
  • Functional testing
  • Production traceability

Packaging & sterilization

  • Cleanroom & custom packagingClass 10,000 cleanroom conditions
  • In-house EO sterilization8 m³ and 4 m³ chambers within the production network

Manufacturing Process

  1. Requirements

  2. Component review

  3. Assembly

  4. Verification

  5. Release

Material and supplier controls, validation where required, production records and controlled change management.

Production in Practice

Production line for cleanroom PVC tubing extrusion
Cleanroom tubing extrusion
Medical-device injection molding machine operating in a cleanroom
Cleanroom injection molding
Operator working on a production mold
Precision tooling
Sterilization chambers at a production facility
Packaging & sterilization
Technical drawing reviewed on a CAD workstation
Engineering & product transfer

What to Include in Your Inquiry

  • Product description and intended purpose
  • Design status and available drawings
  • Target market and documentation requirements
  • Required configuration and estimated volumes
Discuss Your Project